Smart Static Grounding relay (Capacitance + Resistive)

Product Details:

Minimum Order Quantity 1 Piece
Equipment Type Earthing Set
Conductor Material Copper
Application Building Earthing
System Type Chemical Earthing
Typical Resistance 1–2 Ω
Conforming Standard IEC 60364
Usage/Application True Earthing for Tanker body
Brand Smart Tech Instruments and Controls
Country of Origin Made in India
Material Aluminium

 

Smart Static Grounding relay (Capacitance + Resistive)

Exd IIA IIB T6 As per IS/IEC 60079-1:2007,IS/IEC 60079-0:2004
Degree of protection: IP66 as per IEC 60529:2001
Area Classification: DIV /ZONE -1 & 2, Gas Group IIA IIB
Material of Construction: Aluminium Alloy LM6
Gasket: Neoprene O ring
Hardware: Stainless Steel
Earthing: Earthing Screw M6 – 2 Nos. Outside and 1 No Inside
Smart Relay Module duly wired -1
Power Supply: 230V AC
Relay : 2 Potential free relay out put
Cable Entry: 6 Nos.
Terminal : 2.5 Sqmm
Earth Clamp: Along with grounding clamp with 5 meter cable -2 nos.

Smart Static Grounding Earthing System  (SOP – Operating procedure)

– System consist 3 Indicating Lamp

Blue:   Static OK for the Tanker (Capacitance Range 1200 to 7500 Picofarad)

Green: Tanker Resistance < 10 Ohm

Red:    Tanker Resistance > 10 Ohm

SOP:

RED indicating lamp will glow when there is no connection of any clamps to the tanker.

Step 1:
Connect capacitance clamp to the tanker body. It will measure the capacitance of the tanker body and RED will convert to Blue when system measures the capacitance of the tanker between 1200 to 7500 Picofarad.

Step 2:
Connect Grounding clamp to the tanker body through the Earth Pit. It will measure the Resistance of the tanker body and Blue will convert to green when the system measures the Resistance of the tanker < 10 Ohms. Relay will give signal to Pumping/ Flow systems for loading and unloading.

Special Features:

In any case the capacitance or resistance clamp loosen the contacts to the tanker body OR Resistance goes beyond 10 Ohms the Green indicating lamp will convert to Red and Relay will be De -energized to stop the Pumping/ Flow systems.

  • Urja Enterprise